After finally getting things all cleaned up and ready to be worked on again I realized I was actually not that far from putting everything together. So that’s precisely what I started doing in preparation for filling and actually running this thing.
Running through the installation of the hardware and how things are laid out.
Not many pictures this time around, but here are a few of the loop all installed. There’s actually not too complicated, as there’s only two watercooling lines to to run.
Both lines run to the reservoir, one brings water back from the GPU in to the reservoir (top line) and the other goes out of the radiator in to the CPU (bottom line).
Thanks for following along!
Leave a Reply