Jam Packed – Putting the Pieces Back Together

Posted on

by

Last modified on

After finally getting things all cleaned up and ready to be worked on again I realized I was actually not that far from putting everything together. So that’s precisely what I started doing in preparation for filling and actually running this thing.


Running through the installation of the hardware and how things are laid out.


Not many pictures this time around, but here are a few of the loop all installed. There’s actually not too complicated, as there’s only two watercooling lines to to run.

Getting the plumbing down behind the GPUs

Both lines run to the reservoir, one brings water back from the GPU in to the reservoir (top line) and the other goes out of the radiator in to the CPU (bottom line).

Simple plumbing on the reservoir end

Thanks for following along!

Series Navigation<< Dust Off2 GPUs with ITX? >>
Spread the love
Subscribe by Email

Subscribe by email to get notifications of new blog posts sent to your inbox.

Join 186 other subscribers

Follow with Social Media



Archives